China Bente Industry Group logoCHINA BENTEINDUSTRY GROUP
Menu
China Bente Industry Group

Copper & Aluminum Recycling and Reprocessing

Copper & Aluminum Recycling feedstock process and equipment visual
Copper and aluminum recovery. Copper cable, aluminum scrap and other non-ferrous feeds are kept separate from general ferrous scrap so alloy, contamination and downstream product requirements can be controlled.

Process Flow

Copper / Aluminum Receipt and InspectionGrade and Alloy SortingCable Stripping / Granulation or Scrap PreparationMagnetic / Density / Eddy-current SeparationCleaning and DryingMelting / Refining where requiredCathode / Ingot / Sorted Product Dispatch

Equipment / System Architecture

Cable
Conductor processing
Non-ferrous separation
Copper
Aluminum preparation
Melting or electrorefining interfaces

Related project: Foshan Waste Aluminum Recycling & Ingot Production Project

Separate from general ferrous scrap

Copper conductors, aluminum scrap, alloys, coatings, oils and attachments require controlled sorting and a product-specific route.

Process options

Cable stripping or granulation, magnetic and density separation, copper and aluminum preparation, melting and refining interfaces, ingot or anode casting, electrorefining interfaces, dust and flue-gas treatment, dross and residue handling.

Real copper and aluminum feedstock and processing equipmentCopper processing line equipment

Preliminary Capacity & Technical Specification Range

Typical configurable capacity0.3–20 t/h for sorting/preparation; melting/refining capacity is designed separately
Feed basisCable/conductor/alloy grade, coating, oil, attachments, dimensions and target copper/aluminum product
Typical outputsClean copper/aluminum fractions, granules, cathode/ingot where the selected refining route is included
Key utilitiesPower, compressed air, water and route-specific furnace/emission systems

Required for quotation: representative photos and samples, minimum/normal/peak feed quantity, composition and contamination analysis, operating hours, desired products and sizes, local emission/discharge limits, utilities, plot plan and required automation.

Request a Project Evaluation

Share representative waste characterization, throughput range, required outputs, utilities, site constraints and compliance requirements.

Start the engineering evaluation