Oily Sludge Treatment & Recovery

Sludge and residue thickening, dewatering, drying, stabilization and resource-recovery engineering based on verified composition and final outlet criteria.

SLUDGE TREATMENT · SEPARATE ENGINEERING ROUTE

Oily Sludge Treatment & Recovery

Tank-bottom sludge, separator sludge, API/CPI sludge and other oil-water-solid sludge from petroleum storage, refining or oil-handling systems. Waste lubricating oil is a separate liquid-waste category.

Process Flow

Sealed ReceiptSampling and HomogenizationMechanical Separation / DewateringThermal Desorption where justifiedVapor Condensation and Gas TreatmentRecovered Oil / Water HandlingCooled Solids Testing and Dispatch

Preliminary Capacity Range

Configurable range5–200 wet t/day; thermal duty confirmed by oil, water and solids analysis
Final sizing basisRepresentative samples, minimum / normal / peak flow, operating hours, dry-solids load, required cake moisture, utilities and final output route.

Engineering Boundary

Required analyses include oil, water and solids, viscosity, particle distribution, salts, metals, sulfur, flash point, volatile components and hazardous classification. Recovered-oil yield and residue quality are confirmed only after representative testing.

Back to the four sludge categories Request a Project Evaluation

Preliminary Capacity & Technical Specification Range

Typical configurable capacity5–200 wet t/day or 1–50 m³/h dewatering feed
Feed basisSludge origin, dry solids, oil, salts, metals, pathogens, particle size and dewaterability
Typical outputsDewatered cake, dried solids, recovered oil/water where applicable, or compliant residue
Key utilitiesPower, polymer/conditioning chemicals, wash water, thermal energy where drying is included

Required for quotation: representative photos and samples, minimum/normal/peak feed quantity, composition and contamination analysis, operating hours, desired products and sizes, local emission/discharge limits, utilities, plot plan and required automation.